STAGE THREE : POST-CONSTRUCTION STAGE
09 Final Walk-Through

01 // After weeks and in many cases…months of activity, the magical walk-through day arrives!

01 // Pinnacle’s site supervisor has been monitoring quality control every day as well as deficiency resolution, so by the time walk-through arrives it is Pinnacle’s goal to have absolute minimal corrections.

01 // A thorough walk-through check-list is conducted along with the homeowner to ensure that ‘turn-over’ (transition from construction to possession) is as smooth a transition as possible.

01 // Any deficiencies (although minimal) are resolved within 10 business days of possession.


 

 